Bridge Load Testing
Static & dynamic load test per IRC SP:51
Investigation Mandate
To verify the structural performance and load-carrying capacity of newly constructed and existing bridges through static and dynamic loading — mandatory before commissioning per IRC SP:51-2015.
What We Deliver On Site
Field & Laboratory Methodology
Pre-test inspection → instrumentation setup (LVDTs, strain gauges) → staged loading per IRC SP:51 (70%, 100% design load) → deflection & strain recording → 24-hour sustained load → unloading & recovery measurement → analysis vs design → load test certificate.
Certified Outputs & Deliverables
Other Survey & Geotechnical Capabilities
Topographic Survey
Total station, DGPS, drone & contour mapping
Traffic Survey
Volume count, classification, O-D, speed studies
Pavement Condition Survey
PCI, roughness, deflection & distress mapping
Environmental Monitoring
Air, water, soil & noise quality surveys
HAVE AN ENGINEERING CHALLENGE?
Tell us about your project, site condition, testing requirement or engineering challenge. Our team can help identify the appropriate investigation, testing or engineering approach.