Bridge Load Testing - ROB, Bandikui
Client: PWD Rajasthan, Division SikandraLocation: Bandikui, Dausa, RajasthanTimeline: 2025
Bridges

Executive Summary
Load testing of a 30 m span PSC box girder bridge as per IRC SP:51-2015, including instrumentation, staged loading, deflection monitoring and structural performance evaluation.
Project Highlights
- 30 m span PSC box girder bridge
- 100-tonne test load using four 25-tonne vehicles
- Seven dial gauges installed at different locations
- Maximum permissible deflection of 34.5 mm
- Measured deflection within permissible limit
Scope of Work
- Staged loading and instrumentation
- Deflection monitoring at each load stage
- Crack-width measurement using crack-gauge microscope
- Evaluation of readings as per IRC SP:51
Engineering Methodology
STAGE 1
Instrumentation Setup
STAGE 2
Staged Loading
STAGE 3
Deflection and Crack Monitoring
STAGE 4
Evaluation and Report
Standards & Codes Applied
IRC SP:51-2015Load testing of bridges
Certified Deliverables
- Load test report and test results
- Deflection readings at each load stage
- Crack-width observations
- Structural performance evaluation
- Conclusion on safe load-carrying behaviour
Project Outcome & Impact
Under the full 100-tonne test load, measured deflection remained within the permissible 34.5 mm limit, confirming satisfactory structural performance.