EWS Buildings Structural Assessment, Bhiwadi
Client: Executive Engineer, BIDA BhiwadiLocation: Bhiwadi, RajasthanTimeline: 2026
BuildingsLaboratory and NDTRehabilitationSafety Audits

Executive Summary
Namotech assessed EWS residential buildings at Sector-3 and Bus Stand, Bhiwadi, combining visual inspection, on-site non-destructive testing and distress classification with a full repair and rehabilitation estimate.
Project Highlights
- Built-up area of approximately 30,000 sq m
- Two EWS residential colonies, G+3 floors each
- Locations at Sector-3 and Bus Stand, Bhiwadi
- Combined condition assessment and rehabilitation estimate
Scope of Work
- Visual inspection and condition survey
- Distress classification of buildings
- Rebound Hammer, UPV, carbonation depth and half-cell potential testing
- Repair and rehabilitation estimate
- Rehabilitation drawings
Engineering Methodology
STAGE 1
Visual Inspection
STAGE 2
NDT Testing
STAGE 3
Distress Classification
STAGE 4
Estimate and Drawings
Standards & Codes Applied
IS 456RCC code of practice
IS 516 (Part 5)Non-destructive testing of concrete
Certified Deliverables
- Structural assessment report
- NDT test results
- Distress classification of each building
- Detailed BSR-based repair and rehabilitation estimate
- Rehabilitation drawings
Project Outcome & Impact
Namotech delivered a complete condition assessment with documented test results and a BSR-based rehabilitation estimate, giving BIDA a clear, costed basis for repair and rehabilitation.